1.
|
Making proper supports and
brackets at EAF (Electric Arc Furness) Opening and removing all hydraulic
points, hosting & setting platen plant one by one. Finally proper
alignment of plates with EAF.
|
Rs.5,00,000/-
|
2.
|
Taking measurement Gas cut 800
ISMB, 850 ISMB and 69mm MS Plate as per required size. Fabrication and
erection monorail structure as per drawings.
Procurements heavy lifting
arrangement such as chain pulley, monkey winch, hydraulic jug wire sealing
and I beam monorail etc. Opening and removing all steam pipe line fitted with
platen plate at the press opening and removing all nuts & bolts fitted
with platen plate at the press opening & lowering and shifting the all
platen plate on the press from plant to safe place as per your
instruction.
|
Rs.10,00,000/-
|
3.
|
Hoisting & shifting one by one Electrode
plate from gate to EAF. Carrey out fitting the platen plate one by one at the
press machine by proper safety & safe precaution. Finely fitting the all
attachments such as steam inlet, outlet pipe line and hydraulic system. Gas
cutting existing structure, supports & brackets and shifting the same to
safe place.
|
Rs.10,00,000/-
|
4.
|
All the Electrode plate
shifting properly from plant to your designated area as per your instruction.
|
Rs.1,00,000/-
|
Total
|
Rs. 26,00,000/-
|
๐ Support us via UPI
๐ If payment app doesn’t open, scan QR below
Service Work Order Sample
Template / Example of Construction
Service Rate Quotation Work Order in word/ .doc / .pdf Format with Terms and
Conditions
14/1 S K Road
Ref : ST/48/13-17 Date 30.03.2014
ROCKET SALES LTD
Corporate House, 19th Floor
Mumbai – 458 545
ATTN . MR. ANIL ROY
Sub. Opening & removing Electrode plate of EAF
and Re-fitting New Electrode plate
Dear Sir,
Reference verbal discussion on
the subject matter we are submitting our lowest Quotation for your kind
approval such as -
TERMS
& CONDITION
1. All raw materials , consumable such as gas,
oxygen and welding electrodes
Welding
machine supplied by your ends
2. Accommodation, free water and electricity
provided by your ends.
3. Heavy lifting arrangements and all journal
tools & tackles supplied by our ends
4. Rigger gang, Fitter, Welder, helper and
supervisor supplied by our ends.
5. Transportation and footing charges provided
by your ends on actual.
6. Service Tax will be charged
@ 12.50%
PAYMENTS
1.
100% after submission of final bills within 10
days.
Awaiting your valued Work Order which will receive
our best prompt & attention
Thanking you
Yours faithfully
For ABC
CORPORATION
AKHIL JAIN
GM – MARKETING
About Author of the Website:
Neetu Singh is the founder of Resume Formats .Neetu Singh holds an Engineering degree in Computer Science with MBA Degree in Finance and Human Resource (HR). Currently she is running a Global Manpower Consultancy. Contact Her Here
Articles By Categories
10th Class E Book
11th Class E Book
12th Class E Book
Account Documents Examples
Bank Guarantee Document
Banking Documents Samples
Blogger Tips and Tricks
Commercial Documentation Examples
company secretary documents
Corporate Requirements
Ebook pdf
Educational Materials
ERP (SAP)
Export Import Documentation
FEATURED POSTS
HR Documentation Templates
Income Tax Documents
Insurance Documentation Examples
Legal Documents Requirements
Letter of Credit Required Documents
Logistics Documents Requirements
Marketing Department Functions
Massachusetts Mesothelioma Lawyer
Mesothelioma
Production Documentation Format
Purchase Department Required Documents
SAP - FICO User Manual
SAP - MM User Manual
SAP - PP User Manual
SAP - Sales and Distribution (SD) User Manual
Stories
Study Materials
Trademark Documents
tutorials

0 comments:
Post a Comment