ABC Corp/EDE/2012-13/
October 20, 2012
_____________________
Hon’ble Minister of Energy (Ind. Charge)
_____________________
_____________________
_____________________
We would like to inform you that we were declared as a sick unit in January 2001 and a rehabilitation scheme was granted by BIFR. As per the scheme, the Electricity Board has to exempt the electricity duty on power consumed and power generated on DG Set. Accordingly, the Chief Electrical Inspector (T&D) had prepared a synopsis of the case and sent to the concerned Department for recommendation. A photocopy of synopsis is enclosed.
With best regards,
Yours faithfully
For ABC CORPORATION LTD.
NADIM KHAN
PRESIDENT
Encl: A Xerox copy of synopsis.

0 comments:
Post a Comment